P968 Equestrian Club in Abu Dhabi
Project Summary
The P968 Equestrian Club project involved the delivery of a fully coordinated internal road and parking infrastructure system designed to support both operational efficiency and visitor accessibility.
The scope covered road formation, asphalt surfacing, parking layout development, and integration of pedestrian-safe movement zones across the facility. Special attention was given to maintaining smooth traffic circulation within a mixed-use environment combining equestrian activity, visitor access, and service movement.
Execution was carried out through controlled sequencing, ensuring minimal disruption while maintaining alignment with project timelines and quality benchmarks.
Project Gallery
Scope of Work
The project scope was structured to deliver a complete external infrastructure package, including:
- Foundation preparation and subgrade stabilization
- Asphalt road construction across internal circulation routes
- Precision road markings for directional control and safety
- Installation of traffic signage and regulatory indicators
- Kerbstone installation to define road edges and parking zones
- Interlock paving for pedestrian pathways and landscape interfaces
- Parking bay layout including standard and specialty zones
Each activity was executed using calibrated methods to ensure long-term durability and consistent surface performance under operational load conditions.
Key Project Features
- Integrated Road Network: Internal roads were designed and executed to support smooth traffic flow across multiple access points, including roundabouts and directional splits.
- High-Visibility Road Markings: Clear and durable thermoplastic markings were applied to enhance navigation, safety, and compliance with local traffic standards.
- Structured Parking Layout: Well-defined parking zones, including shaded areas and designated specialty bays, were delivered to improve usability and space optimization.
- Pedestrian & Vehicle Segregation: Interlock pathways and kerb definitions were implemented to ensure safe pedestrian movement alongside vehicular routes.
- Specialized Surface Treatments: Dedicated zones such as EV charging bays were finished with distinct surface coatings to ensure visibility and functional clarity.
- Landscape Integration: Softscape areas and tree-lined medians were incorporated alongside infrastructure works to maintain a balanced and functional environment.